Peregrine: The CNC Machine Decision
Case
Author: Tony Bell & Andrew Fergus
Online Pub Date: January 02, 2018 | Original Pub. Date: 2017
Subject: Budgeting, Cost Accounting, Strategic Decision-Making
Level: | Type: Direct case | Length: 1183
Copyright: © 2017 IMA Educational Case Journal. All rights reserved.
Organization: Peregrine | Organization size: Small
Region: Northern America | State:
Industry: Manufacture of electrical equipment
Originally Published in:
Bell, T. , & Fergus, A. ( 2017). Peregrine: The CNC Machine Decision. IMA Education Case Journal, 10(
3), Article 1.
Publisher: Institute of Management Accountants
DOI: https://dx.doi.org/10.4135/9781526446275 | Online ISBN: 9781526446275
© 2017 IMA Educational Case Journal. All rights reserved.
The case studies on SAGE Business Cases are designed and optimized for online learning. Please refer to the online version of this case to fully experience any video, data embeds, spreadsheets, slides, or other resources that may be included.
This content may only be distributed for use within Beijing Foreign Studies Univer. https://dx.doi.org/10.4135/9781526446275
SAGE© 2017 IMA Educational Case Journal. All rights reserved.
SAGE Business Cases
Page 2 of 5Peregrine: The CNC Machine Decision
Abstract
Peregrine, a manufacturer of custom retail displays, had seen its production line slow to a halt when one of the company’s two CNC machines had broken down. Brian French, the company’s president, was determined to relieve the bottleneck. French believed he had three viable options: buy a new CNC machine, lease a new CNC machine, or run an extra shift to keep his current machines working for more hours. This introductory case is based on a real-world capital budgeting decision. It requires students to use net present value (NPV) calculations and consider all three options both qualitatively and quantitatively to make recommendations for French.
Case
Introduction
It was another sleepless night for Brian French. As a new father, French had grown accustomed to sleep deprivation, but on this night, it was his business—not his newborn daughter—that had him tossing and turning. French was the president and co-owner of Peregrine, a Vancouver-based manufacturer of custom retail displays that were used in stores, banks, and art galleries (Exhibit 1). Peregrine had been working on a display for Best Buy when one of the company’s two computer-numerical-control (CNC) machines broke down (Exhibit 2). When the machine went down, French watched progress on the Best Buy job slow to a halt. Although French had been assured that the CNC machine would be back up and running within 24 hours, the breakdown revealed a deeper problem: the CNC machines represented a major bottleneck for Peregrine, and if this machine was down for more than the promised 24-hour period, the Best Buy job could not be completed on time, and workers would need to be sent home. French was frustrated by this predicament and was determined to make the changes necessary to ensure it would not happen again.
Peregrine
In 2012, French left PricewaterhouseCoopers to purchase Peregrine along with two co-investors. The investment team had been looking for an opportunity to purchase a company with a successful track record and a founder who was ready for retirement; Peregrine had fit the bill. Founded in 1977, Peregrine had been operated profitably for 35 years in downtown Vancouver, British Columbia, Canada. In Peregrine, the investors would be acquiring a company with a history of success and an experienced team that had expertise in manufacturing a wide array of custom plastic products.
When Peregrine was acquired in 2012, it had employed 6 people and had $600,000 in sales. Under French’s management, the company had grown to more than 30 employees and more than $6 million in sales by 2016.
The CNC Machine Decision
When the CNC machine broke down, it was a wake-up call for French. The production line was dependent on both CNC machines working full time—if they slowed down or needed repair, the business suffered. French believed the key to relieving this bottleneck would be increasing capacity. It not only would prevent downtime but also would allow the company to take on new business. If capacity increased, French estimated that sales revenues would rise by at least $50,000 per month due to unmet demand and increased efficiency. The company’s margins on the additional revenues were expected to be 35%. French saw three viable options to increase capacity:
SAGE© 2017 IMA Educational Case Journal. All rights reserved.
SAGE Business Cases
Page 3 of 5Peregrine: The CNC Machine Decision
1. 2. 3.
1.
Purchase an additional CNC machine for cash, Finance the purchase of an additional CNC machine, or Add a third shift (a night shift) to better utilize the two CNC machines Peregrine already owned.
French considered the details of each option, keeping in mind that for long-term projects he would use a discount rate of 7%.
Option 1: Purchase a New CNC Machine with Cash
Although it would be costly, the idea of adding a third CNC machine appealed to French. It would provide him peace of mind that if there were a breakdown, jobs would continue on schedule. French’s preliminary research revealed that the cost of the new equipment would be $142,000. He also estimated that there would be increased out-of-pocket operating costs of $10,000 per month if a new machine were brought online. After five years, the machine would have a salvage value of $40,000. Although Peregrine did not have the cash readily available to make the purchase, French believed that with a small amount of cash budgeting and planning, this option would be feasible.
Option 2: Finance The Purchase of a new CNC Machine
The company selling the CNC machine also offered a leasing option. The terms of the lease included a down payment of $50,000 and monthly payments of $2,200 for five years. After five years, the equipment could be purchased for $1. The operating costs and salvage values would be the same as option 1, the purchasing option. The company had the necessary cash on hand to make the down payment for the lease. With both the leasing and purchasing options, the company had sufficient space to operate the new equipment, and French believed he had almost all of the right employees in place to execute this plan.
Option 3: Add a Third Shift
French and one of his co-investors had extensive experience in the trucking industry and had seen firsthand the effect of utilizing equipment around the clock. French believed adding a third shift could unlock a lot of value at Peregrine, and it could be done at a low cost. Adding a third shift would involve moving several existing employees to work the night shift and would also mean hiring some new employees. Although French believed that in time he may add a full third shift to increase overall capacity, his initial plan was for the night shift to run as a “skeleton crew” with the primary purpose of keeping the CNC machines operational for 24 hours. He believed that adding a third shift would produce the same increase in revenue as adding a new CNC machine to his existing shifts. He estimated that adding a third shift would create $12,000 in additional monthly out-of-pocket operating costs, but no new machinery would need to be purchased. Based on his trucking experience, French knew this option would be difficult to execute, as there were major safety and supervision challenges associated with running a night shift.
Moving Forward
French wanted to get moving on a solution and arranged a conference call with his two co-owners. He knew his co-owners would be eager to learn the numbers behind each option, but he also knew that nonfinancial information would be just as crucial in making a recommendation. Before the call, French sat down at his desk to fully analyze the options.
Assignment Questions
Without using any numbers, identify the strengths and weaknesses of the three options identified by French. Are there any other options French should consider?
SAGE© 2017 IMA Educational Case Journal. All rights reserved.
SAGE Business Cases
Page 4 of 5Peregrine: The CNC Machine Decision
2. 3. 4.
Compute and compare the net present value and payback period of each option. Make a recommendation for French. Rounding to the nearest 1%, at what discount rate does leasing produce a higher net present value than paying cash?
About IMA®
IMA, the association of accountants and financial professionals in business, is one of the largest and most respected associations focused exclusively on advancing the management accounting profession. Globally, IMA supports the profession through research, the CMA® (Certified Management Accountant) program, continuing education, networking, and advocacy of the highest ethical business practices. IMA has a global network of more than 80,000 members in 140 countries and 300 professional and student chapters. Headquartered in Montvale, N.J., USA, IMA provides localized services through its four global regions: The Americas, Asia/Pacific, Europe, and Middle East/Africa. For more information about IMA, please visit www.imanet.org.
https://dx.doi.org/10.4135/9781526446275
SAGE© 2017 IMA Educational Case Journal. All rights reserved.
SAGE Business Cases
Page 5 of 5Peregrine: The CNC Machine Decision
- Peregrine: The CNC Machine Decision
- Case
- Abstract
- Case
- Introduction
- Peregrine
- The CNC Machine Decision
- Option 1: Purchase a New CNC Machine with Cash
- Option 2: Finance The Purchase of a new CNC Machine
- Option 3: Add a Third Shift
- Moving Forward
- Assignment Questions
- About IMA®