Option #1: Develop Work Breakdown Structure (WBS)
Assume the following major tasks and develop a WBS for a software development project:
Analyze,
Design,
Develop,
Test,
Deploy, and
Maintain.
Using the information provided above, please respond to the following instructions and questions:
Construct a detailed WBS table for the project using any graphical tools. The WBS should demonstrate the organization of the project. Please be sure to
include at least four levels of tasks (i.e., main task, sub-task, etc.). You may want to consider using Microsoft Project, WBS Chart Pro, Microsoft Excel, or any
other available programs to assist you in developing your WBS.
What are the key attributes of a work package?
Develop a responsibility assignment matrix for the whole project with personnel in the columns and deliverables in the rows.
What metrics would you track to measure the effectiveness of your WBS plan?
Your responses should be integrated in a well-written paper that meets the following requirements:
Be 2-4 pages in length, plus graphical elements, placing these graphical elements in an appendix,