7-2FinalProjectSubmissionPresentation-QSO-420-H5938IntegratedCost_SchedControl23EW5.pdf

7‐2 Final Project Submission: Presentation

Instructions

Submissions

No submissions yet. Drag and drop to upload your assignment below.

QSO‐420‐H5938 Integrated Cost/Sched Control 23EW5 MA

mySNHU Online Student Services Shapiro Library Academic SupportCourse Menu Tools Help

The state of a project is assessed using Earned Value Management (EVM) measures and supporting project

documentation. The results of such an assessment are typically compiled in a report written for the project

manager that summarizes the state of the project and identifies areas in which performance is currently or

potentially deficient.

For this summative assessment, you will create a presentation for the project manager based on a case study that

reports the project's performance, including any current or potential deficiencies that you have identified, as well

as your recommendations for improving project performance.

Specifically, all the critical elements must be addressed, including Section IV, which has not been previously

turned in. Use presentation (“speaker”) notes to articulate those points that are not observable in the

presentation.

For additional details, please refer to the Final Project Guidelines and Rubric PDF document.

Listen

7-2 Final Project Submission: Presentation – QSO-420-H5938 Integrated Cost/Sched Control… https://learn.snhu.edu/d2l/le/content/1315920/viewContent/24602281/View

1 of 2 6/11/2023, 10:19 AM

Reflect in ePortfolio

Drop files here, or click below!

Upload Choose Existing

You can upload files up to a maximum of 2 GB.

Task: Submit to complete this assignment Assessment

QSO‐420 Final Project Rubric

(SA)

Record

Activity Details

7-2 Final Project Submission: Presentation – QSO-420-H5938 Integrated Cost/Sched Control… https://learn.snhu.edu/d2l/le/content/1315920/viewContent/24602281/View

2 of 2 6/11/2023, 10:19 AM

Our customer support team is here to answer your questions. Ask us anything!